Project Details

Construction of UHT Warehouse

Client:

Brookside Limited

Architect:

Scann Consults Limited

Year of Implementation:

2018

Project Summary

The construction of the UHT Warehouse for Brookside Limited signifies a strategic expansion in its storage and distribution capabilities. Designed by Scann Consults Limited and implemented in 2018, this project aimed to create a state-of-the-art facility for the storage of ultra-high-temperature (UHT) processed dairy products. The warehouse was designed to meet stringent quality standards, ensuring optimal conditions for the storage of sensitive dairy items. Key features of the warehouse include advanced temperature control systems, efficient space utilization, and robust security measures to maintain product integrity and safety.

Scann Consults Limited provided comprehensive architectural and engineering services, ensuring the design met both functional and regulatory requirements. The construction process emphasized the use of durable materials and cutting-edge technology to support Brookside Limited’s operational needs. The successful completion of the UHT Warehouse in 2018 underscores Brookside Limited’s commitment to enhancing its supply chain infrastructure and maintaining high standards of product quality. This new facility not only supports increased production capacity but also reinforces Brookside Limited’s position as a leader in the dairy industry, ensuring reliable supply and distribution of their UHT products.

Sign Up to Get the Latest Updates.

Please send us an email so that we can add you on our mailing list.